top of page
PROJECT PORTFOLIO
JOURDAN RIVER DREDGING
PROJECT LOCATION:
HANCOCK COUNTY, MS
We excavated 7500 CY of material out of Jourdan River. This required removing the material with a long reach excavator and putting the material on a transport barge to haul offsite. The project was completed ahead of schedule with no environmental impacts.
REFERENCES:
• Hancock County
bottom of page