top of page
PROJECT PORTFOLIO
PERDIDO GRANDE MARINA
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.
PROJECT LOCATION:
PERDIDO GRANDE CONDOMINIUM,
ORANGE BEACH, AL
Black Diamond construction was contracted in May of 2021 for the Perdido Grande Marina Hurricane Sally damaged marina project. We self-performed the entire project beginning with the demolition phase. This project consisted of over 1200 pilings and 1400 LF of decking to create the 92 slip marina. The owners at Perdido Grande have been very satisfied with the craftsmanship performed by Black Diamond Construction.
REFERENCES:
• Perdido Grande
bottom of page