top of page

PROJECT PORTFOLIO

PERDIDO GRANDE MARINA

PROJECT LOCATION:

PERDIDO GRANDE CONDOMINIUM,
ORANGE BEACH, AL

Black Diamond construction was contracted in May of 2021 for the Perdido Grande Marina Hurricane Sally damaged marina project. We self-performed the entire project beginning with the demolition phase. This project consisted of over 1200 pilings and 1400 LF of decking to create the 92 slip marina. The owners at Perdido Grande have been very satisfied with the craftsmanship performed by Black Diamond Construction.

REFERENCES:

• Perdido Grande

bottom of page